Ask most people familiar with the BCA how many exits each storey of a Class 2 building over 25 m effective height needs, and the instinctive answer is two.
But what happens when the entire storey is one sole-occupancy unit?
This is a hypothetical design study developed in-house by DC Partnership to explore the interaction between NCC 2022 Volume One Clauses D2D2 and D2D3, and to encourage industry discussion. It is not a real project, precedent or approved design.
D2D3 of NCC 2022 Volume One sets the number of exits a building must provide. Every storey needs at least one.
The conventional reading is straightforward. Once a Class 2 building exceeds 25 m in effective height, D2D3 is generally understood to require at least two exits from each storey. For most residential towers, that is where the discussion ends.
D2D2 sets out the application of Part D2. It states that the Deemed-to-Satisfy Provisions of Part D2 do not apply to the internal parts of a sole-occupancy unit in a Class 2 or 3 building.
In a conventional building the exemption goes largely unnoticed. It keeps the inside of an apartment from being treated like the common parts of the building. Nobody reads it as touching the number of exits from a storey, because the storey always contains more than one SOU and some shared circulation between them.
Change the configuration and the question changes with it. If a storey contains nothing but one SOU, every part of that storey is an internal part of the SOU.
To test the interaction, we set up a hypothetical Class 2 residential tower above 25 m effective height. The uppermost storey is occupied entirely by one sole-occupancy unit. The lifts open into a private lobby that forms part of that SOU. There is no common corridor and no shared circulation on the level, and the storey is served by a single exit.
The hypothetical tower. The uppermost storey sits well above the 25 m effective height threshold.
The uppermost storey. One SOU occupies the entire floor, the lifts open into a private lobby within it, and the single exit is entered from inside the unit.
Plan. The SOU boundary is the storey boundary. The dashed line is the path of travel to the exit stair, which stays inside the SOU the whole way.
The wording gives rise to two competing interpretations. We have set them out side by side.
Interpretation 1
Interpretation 2
This reading follows the clauses in sequence and gives particular weight to D2D2 as an application provision.
The alternative reading treats D2D2 and D2D3 as operating at different levels.
D2D2 exempts the internal parts of the sole-occupancy unit, while D2D3 may still operate independently as a requirement applying to exits from the storey itself.
On this reading, the fact that the entire storey is occupied by one SOU does not remove the requirement for two exits from that storey.
The first interpretation is compelling because D2D2 is an application provision.
It does not create an exception to D2D3 or modify the 25 m effective height threshold. Instead, it determines whether the Deemed-to-Satisfy Provisions of Part D2 apply in the first place.
If the entire storey genuinely forms part of a single sole-occupancy unit, the question becomes whether there is any part of that storey to which D2D3 can operate.
The argument is not that D2D3 allows one exit above 25 m. The argument is that, in this particular configuration, D2D3 may not apply at all.
The question ultimately turns on how two concepts are read together: the internal parts of a sole-occupancy unit and the requirement for exits from a storey.
If the internal parts of the SOU can extend to the entirety of a storey, the first interpretation follows.
If the requirement for exits from a storey operates independently of the SOU occupying that storey, the alternative interpretation follows.
The wording creates a genuine interpretation question.
On a live project, that interpretation would need to be considered with the relevant certifier and, where appropriate, the relevant authority. A Performance Solution may also provide an alternative pathway where agreement on the Deemed-to-Satisfy interpretation cannot be reached.
Most buildings follow familiar arrangements, so provisions like D2D2 and D2D3 usually sit together without much friction.
Change one part of the configuration and suddenly the relationship between them becomes much more interesting.
That is why we developed this study.
Building code consultancy is not simply about finding a clause and applying it in isolation. It is about understanding where a provision applies, where it stops applying and how it interacts with the rest of the NCC and the design itself.
Sometimes changing the design changes the question.
And therefore, the answer.
Does D2D2 take D2D3 out of play where the entire storey is a single SOU, or does the requirement for two exits still apply at the storey level?
Ellie is the powerhouse behind DC Partnership’s financial, operational and people performance. With over a decade of experience in consultancies, startups and corporate environments, she’s a master at combining big-picture strategy with hands-on problem-solving. Since joining DC Partnership in 2021, Ellie has streamlined operations, expanded the company’s footprint and kept everything running smoother than ever. A champion of diversity, inclusion and female leadership, Ellie is all about creating a workplace where everyone feels valued—and where no challenge is too big to tackle.